Skip to Main Content
ProPricer Contractor and Govt Edition Ideas Portal
ADD A NEW IDEA

All ideas

Showing 131 of 131

Disconnect Users from Proposal

Oftentimes, we have to lock a proposal, but users may just leave the proposal open but not be actively using the proposal. As a result, the system will not allow us to lock while "active" users have the proposal open. Please add a button under the...
Nikolai Slepushkin over 2 years ago in  0 Future consideration

Include the ability to add multiple scheduled rates to a single resource.

I would like to be able to add multiple scheduled rates to a single resource. In certain cases when a contract may have the choice between contract types, I would like to be able to include the rate deck for all scenarios and run reports to view t...
Nikolai Slepushkin over 2 years ago in  0 Future consideration

Add "Apply to All" Material Cost

Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
Nikolai Slepushkin over 2 years ago in  0 Future consideration

Time-Phased Material Ad Hoc Report

Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
Nikolai Slepushkin over 2 years ago in  0 Future consideration

Travel Escalation Rates for Airfare, Per Diem, Hotel, miledge, rental car, etc

Add options to apply escalation factors by year for airfare, per diem, rental car and others at one time only for all destinations; thus we don't need to manually add yearly escalation factors one by one for each trip (we have thousands of destina...
Nikolai Slepushkin over 2 years ago in  0 Future consideration

Ability to lock off shared rate tables.

| Allow rate tables to be locked/unlocked to avoid accidental change when used by multiple people. |
Nikolai Slepushkin over 2 years ago in  0 Future consideration

Use Resource Spread Dates when using the Flex/Shift What-if feature for an Individual Resource

When Flex/Shifting an individual resource in a Task, the dates displayed in the dialog are the Start and End dates of the Task, not the dates of the spread of the specific resource. If the resource is not spread across the entire Task period of pe...
Nikolai Slepushkin over 2 years ago in  0 Future consideration

LOCK or Protect PIVOT Layout

Once PIVOT layout format is created, can we add a feature to LOCK or Protect the layout so that by accident no one else can overwrite it?
Aaron Hale over 2 years ago in  0 Planned

Update Template for CER Base/Derivative Changes

Just like the Update Current Proposal offers the ability to update the CERs, it would be nice if there was the same option on the templates.
Guest over 1 year ago in  0 Future consideration

Batch Report Options

Allow batch reports to be saved that do not have default start/end dates for the Period Selection in rate reports (specifically the Rate Band and Indirect Rate reports.) Currently we have a manual work around where we export the batch report out o...
Nikolai Slepushkin over 2 years ago in  0 Future consideration