Skip to Main Content
ProPricer Contractor and Govt Edition Ideas Portal
ADD A NEW IDEA

All ideas

Group Pivot Grid Data

It would make it very convenient to be able to group multiple data selections under one renamed header. For example, if the algorithm contains several direct cost elements, it would be nice to add those in a pivot grid, then merge them into one re...
about 4 years ago in  0 Future consideration

Curve Unit Price to Proposal Quantity

Ability to curve the Material Unit price up or down to the Proposed Quantity. For example PO history is for a specific quantity vs Quotes where you may have range pricing. It would be great if the software curved the unit price.
about 4 years ago in  0 Planned

Footer On All Worksheets When Exporting Full Pricing

When printing a report to Excel with Full Pricing, the designated report footer does not print on the Rate worksheets. Would like to see the assigned report footer should print on all worksheets.
about 4 years ago in  0 Planned

Add the ability to archive and/or delete Audit and Change Log Files

Currently, ProPricer can be configured to produce "Change" and "Audit" logs, which is great! Since this information is stored in the database, some method of archiving and/or deleting log files based on parameters (e.g., date, size, etc.) needs to...
about 2 years ago in  0 Future consideration

Add the ability to Pivot on the Resource ID

Feature Request: Pivot Grid Support for Resource ID Summary: Enable the Pivot Grid to include and aggregate on Resource ID so users can analyze BOE Pro data at the individual resource level. This will allow teams to pivot, filter, and report on me...
8 months ago in  0 Future consideration

CER Bases and Factor on DCB

Please allow the CER Bases (derivatives) and Rate/Factors to display on the Detail Cost Breakdown. Currently, only the total CER cost is displayed without showing the base and factor/rate.
about 4 years ago in  0 Future consideration

Sanitize proposal prior to sending to EBS

Create menu of options to delete/scramble names, bidders, BOE, etc etc etc. Often times a request for a .zip by EBS is for only one issue, and a lot of the data can be stripped out.
about 4 years ago in  0 Planned

Update Resource Field Values After Changes are Made in the Resource Library Table

After a resource with custom fields & values has been added to a proposal, updates made in the Resource Library to the value(s) for those custom resource fields are not being reflected in the proposal(s) where the resource exists. For example,...
about 4 years ago in  0 Planned

Make Override for Material Escalation

Please add the ability to convert all material escalation on a proposal to an override so they will not be updated when the Escalation Table is updated. Or, make the ability to stop the escalation rates from updating when the Escalation Table is u...
about 4 years ago in  1 Future consideration

Enhance "Formula" Module Functionality

Currently, the "Formula" tab allows only numeric calculations (for ex.: 10,000 Factory hours * 0.25 Factory Support Metric = 2,500 Factory Support hours). Could "Formula" be enhanced to allow calculations referring to the contents of other Task ID...
about 4 years ago in  0 Future consideration