Skip to Main Content
ProPricer Contractor and Govt Edition Ideas Portal
ADD A NEW IDEA

All ideas

Batch Report Options

Allow batch reports to be saved that do not have default start/end dates for the Period Selection in rate reports (specifically the Rate Band and Indirect Rate reports.) Currently we have a manual work around where we export the batch report out o...
almost 4 years ago in  0 Future consideration

Proposal-Specific Overrides for Multiple Indirect Pools

Please create the ability to update multiple indirect pools at one time for proposal-specific overrides. The functionality exists for global indirect pool updates, but often times, clients will have caps on specific indirect rates. As a result, we...
about 4 years ago in  0 Future consideration

Flex Shift Materials

Please add the ability for Flex Shift to adjust the dates of the Materials on the Material tab of the Task without changes the rest of the Task.
about 4 years ago in  0 Future consideration

Disconnect Users from Proposal

Oftentimes, we have to lock a proposal, but users may just leave the proposal open but not be actively using the proposal. As a result, the system will not allow us to lock while "active" users have the proposal open. Please add a button under the...
about 4 years ago in  0 Future consideration

Ability to lock off shared rate tables.

| Allow rate tables to be locked/unlocked to avoid accidental change when used by multiple people. |
about 4 years ago in  0 Future consideration

LOCK or Protect PIVOT Layout

Once PIVOT layout format is created, can we add a feature to LOCK or Protect the layout so that by accident no one else can overwrite it?
over 3 years ago in  0 Planned

Limit access to PP Imp/Exp tool in 9.5

Description: Now that PP Imp/Exp is no longer an add-on in excel. We need functionality to treat it like other import / export functions. Use Case/Example: We have a API that controls data imports, users should not be utilizing the pp imp/exp tool...
over 1 year ago in  0 Future consideration

Include the ability to add multiple scheduled rates to a single resource.

I would like to be able to add multiple scheduled rates to a single resource. In certain cases when a contract may have the choice between contract types, I would like to be able to include the rate deck for all scenarios and run reports to view t...
about 4 years ago in  0 Future consideration

Add "Apply to All" Material Cost

Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
about 4 years ago in  0 Future consideration

Time-Phased Material Ad Hoc Report

Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
about 4 years ago in  0 Future consideration