Skip to Main Content
ProPricer Contractor and Govt Edition Ideas Portal
ADD A NEW IDEA

All ideas

Showing 113

Add "Apply to All" Material Cost

Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
Nikolai Slepushkin about 3 years ago in  0 Future consideration

Time-Phased Material Ad Hoc Report

Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
Nikolai Slepushkin about 3 years ago in  0 Future consideration

Travel Escalation Rates for Airfare, Per Diem, Hotel, miledge, rental car, etc

Add options to apply escalation factors by year for airfare, per diem, rental car and others at one time only for all destinations; thus we don't need to manually add yearly escalation factors one by one for each trip (we have thousands of destina...
Nikolai Slepushkin about 3 years ago in  0 Future consideration

Ability to lock off shared rate tables.

| Allow rate tables to be locked/unlocked to avoid accidental change when used by multiple people. |
Nikolai Slepushkin about 3 years ago in  0 Future consideration

Use Resource Spread Dates when using the Flex/Shift What-if feature for an Individual Resource

When Flex/Shifting an individual resource in a Task, the dates displayed in the dialog are the Start and End dates of the Task, not the dates of the spread of the specific resource. If the resource is not spread across the entire Task period of pe...
Nikolai Slepushkin about 3 years ago in  0 Future consideration

Adding the Match Capability to Profit/Fee in the CER Derivatives

The issue with assigning the Profit/Fee rate at the resource level is that there is no way for the CER derivatives to inherit the Profit/Fee rate assigned to the base resource that generated it.
Nikolai Slepushkin about 3 years ago in  0 Future consideration

Hierarchy Structure on Import/Export from Excel, and selecting reports

Some parts of ProPricer are flat. For instance, when I need to pick a proposal for a report, it's a flat alphabetical list. It would be easier if I could see the proposal tree with all my folders. Same with import/export from Excel. Believe there ...
Nikolai Slepushkin about 3 years ago in  0 Future consideration

Proposal-Specific Overrides for Multiple Indirect Pools

Please create the ability to update multiple indirect pools at one time for proposal-specific overrides. The functionality exists for global indirect pool updates, but often times, clients will have caps on specific indirect rates. As a result, we...
Nikolai Slepushkin about 3 years ago in  0 Future consideration

Ability to quiesce the server service

Please add the ability to quiesce the server to permit a graceful/controlled restart of the server process. Allow existing connections remain (so they can be gracefully closed by the users or administrators). But don't allow new connections to be ...
Nikolai Slepushkin about 3 years ago in  0 Future consideration

Ability to configure/manage the ProPricer server from a command line interface (CLI)

We would like the ability to configure and manage a ProPricer server from a CLI. * - Start/Stop the "ProPricer Applicaiton Server 9" service - arguably, this can already be done in PowerShell, so it may be unneeded ** - Create/modify/delete a data...
Nikolai Slepushkin about 3 years ago in  0 Future consideration