Skip to Main Content
ProPricer Contractor and Govt Edition Ideas Portal
ADD A NEW IDEA

All ideas

Flex Shift Materials

Please add the ability for Flex Shift to adjust the dates of the Materials on the Material tab of the Task without changes the rest of the Task.
over 4 years ago in  0 Future consideration

Disconnect Users from Proposal

Oftentimes, we have to lock a proposal, but users may just leave the proposal open but not be actively using the proposal. As a result, the system will not allow us to lock while "active" users have the proposal open. Please add a button under the...
over 4 years ago in  0 Future consideration

Ability to lock off shared rate tables.

| Allow rate tables to be locked/unlocked to avoid accidental change when used by multiple people. |
over 4 years ago in  0 Future consideration

Unable to save or restore a custom report over an existing custom report

We have a number of custom reports that are included in multiple batch reports and are also saved to many people's Favorites bars. Since these custom reports are heavily used, we do not want to risk breaking them while performing updates, therefor...
over 2 years ago in  0 Planned

LOCK or Protect PIVOT Layout

Once PIVOT layout format is created, can we add a feature to LOCK or Protect the layout so that by accident no one else can overwrite it?
almost 4 years ago in  0 Planned

Include the ability to add multiple scheduled rates to a single resource.

I would like to be able to add multiple scheduled rates to a single resource. In certain cases when a contract may have the choice between contract types, I would like to be able to include the rate deck for all scenarios and run reports to view t...
over 4 years ago in  0 Future consideration

Add "Apply to All" Material Cost

Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
over 4 years ago in  0 Future consideration

Time-Phased Material Ad Hoc Report

Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
over 4 years ago in  0 Future consideration

Travel Escalation Rates for Airfare, Per Diem, Hotel, miledge, rental car, etc

Add options to apply escalation factors by year for airfare, per diem, rental car and others at one time only for all destinations; thus we don't need to manually add yearly escalation factors one by one for each trip (we have thousands of destina...
over 4 years ago in  0 Future consideration

Concurrent License Validation Alert

The concurrent license validation is required every 6 months. Could an enhancement be made to provide some sort of alert when the validation will be required within the next N days? This will allow for me to plan downtime with the users to validat...
almost 4 years ago in  0 Planned