Skip to Main Content
ProPricer Contractor and Govt Edition Ideas Portal
ADD A NEW IDEA

All ideas

Indicator (tick) for when data is present against a task

| Similar to the green tick on each tab which shows that there is data in a BOE, CER, Travel tab etc�..have a high level indicator against a Task ID in the task view to show that data is entered in that element |
over 4 years ago in  0 Future consideration

Attachment names shown in full (eg BOE attachements)

| We often have similar name attachment filenames, particularly when there are updates - it is very hard to determine which is which as the names are truncated - Could these be displayed in a list format, or other view where you can see all of the...
over 4 years ago in  0 Future consideration

Add total proposal summary to Travel Distribution Matrix Report summarizing all trips and cost across years and months.

Description: The current Travel Distribution Matrix Report breaks down each trip by cost element with a distribution matrix by year and month. We would like the ability to summarize the entire proposals' trips in the same distribution matrix forma...
over 1 year ago in  0 Future consideration

Import MS Project with Additional Assignment Mapping

The Assignment Mapping tab when importing from MS Projects file is limited to 1 field. Would like to expand this to 2 or more fields from the Resource Sheet data.
almost 3 years ago in  0 Future consideration

Import/Export Access Tags

No description provided
over 4 years ago in  0 Planned

Lockable Product Libraries

Description: Add permissions to lock a product library. Allowing a library to remain in materials but unable to change costing and bom data Use Case/Example: When associated costs or BOM structure changes for a product the previously quoted bom sh...
over 1 year ago in  0 Future consideration

Modifiable Field(s) in Proposal List Screen

Please allow edits to Proposal User Fields directly within the Proposal List Screen. Currently, when double-clicking "proposal" in the navigation pane, it pulls up a full list of proposals. Within that field are many of the proposal properties men...
over 1 year ago in  0 Future consideration

Batch access to Proposal Rights/View rights

I would like the ability to give batch access to Proposal Rights, either by selecting multiple proposals at once in the Proposal List, or right-clicking on a folder (that would in turn give access to all the proposals in that folder) and having a ...
about 3 years ago in  0 Future consideration

Add Resource Selection to Summary Travel Report

This will allow us to use a resource selection on this report.
over 3 years ago in  0 Planned

Cell Selection Mode Pasting - Resource / Travel View

Please allow for ease of pasting the Task ID and Resource on the Resource View and Travel View without prompting the "Select Task" dialogue box for each resource row. Even if the Task ID is pasted in, the system hard-stops on each resource row. Wh...
over 1 year ago in  0 Future consideration